...
- Click the Create Issue link in the top right side of the browser (on every page) to create a new CDRator JIRA issue.
This displays the Step 1. Choose the project and issue type screen below. - Click and open the Project-dropdown box and select the relevant project.
- Click and open the Issue Type-dropdown box and select the relevant issue type.
- Click the Create button.
This displays Step 2. Enter the details of the issue screen. - Fill in the fields.
Mandatory fields- Summary: An explanatory and recognizable name for the issue.
- Billable: Indicates whether the issue is billable or not (Change Requests are always billable).
- Environment: Indicates in which environment the bug exists (only for bugs).
- Description: It is important to fill out a thorough and complete description of the issue.
Optional fields - External ref.: If the customer needs to identify the issue in their own system.
- Security Level: Can be set to either Internal or None
- Priority: Priority of the ticket. 1, 2, 3 or 4 with 1 indicating the highest priority.
- Severity:Only valid for bugs. Indicates how severe the bug is compared to other bugs of the same priority. This helps indicates the fixing order of bugs (Fatal, Severe or Minor.)
- Server: If name of server is available (only for bugs and bugs (non-production)).
- Reproducing: Description of steps and frequency (only for bugs).
- Component/s: In what area is the change needed og bug found. Select from the drop-down list.
- Labels: More detailled information on the area of focus. Select from the drop-down list.
- Go to the Release Tab:
This displays Step 3. Bringing forward the following page: - Fill in the field.
Mandatory Field:
- Affects Version/s: Choose the version (release) the CR or bug is affecting.
...
The T-shirt estimate covers time for all involved departments, i.e. BC, AC, Product and QA (if QA is requested).
- XS = 1 - 7 hours will be set to 7 hours
- S = 8 - 12 hours will be set to 12 hours
- M = 13 - 50 hours will be set to 30 hours
- L = 51 - 120 hours will be set to 85 hours
- XL = 121 - 300 hours will be set to 210
- P = Project for more than 300 hours